Planned for 2024/2025
- Replace 2 septic systems
Planned for 2024
- Replace remaining 7 sliding doors, new sidewall shingles, windows, and trim
January 2024
- Replaced indoor pool water heater and air heater
July 2023
- Indoor pool and spa surface replastering
May 2023
- Replaced 8 sliding doors, new sidewall shingles, new second floor decks, windows, and trim
January 2023
- Emergency office/lobby roof replacement
December 2022
- New A/C system for South Building (oceanfront)
October 2022
- Completed the replacement of exterior tables and chairs outside all rooms with patios/decks, including studios
August 2022
- Completed renovation of fitness center, including new heat/AC system with dehumidification
July 2022
- Purchased new chaise lounge cushions and table umbrellas
- Purchased 4 new grills
- Built a new grill platform between the outdoor shower and the South Building
June 2022
- Installed new doors for the laundry room, housekeeping closet, and indoor pool
May 2022
- Replaced 8 sliding doors and 8 second floor decks in West Building
- Installed new windows and trim in West Building
April 2022
- Completed 3-year long (due to Covid) interior renovation of all rooms